Projects, engagements and technical mandates.

Representative engagements across Divisions, Centers of Excellence and Industries — from bankable feasibility and technical due diligence to construction supervision, ITC and ESG integration.

Engagements · Project register

Institutional mandates across sectors and funding sources.

Each engagement follows the Institute's methodology — EU-aligned, ESG-integrated, delivered to the bankability standard required by lenders and regulators.

Representative engagements below. Full case-study register publishes as Phase 2 of the content rollout, with client consent.

10+Representative
EUIFI · Public · PPP
WBRegional coverage
€ 5M – 500M range
Filter

Browse the project register.

Filters reflect the institutional register — Division, Industry, country, service, CoE involved, ESG relevance, year, value band, status, role and funding source.

Filters will be fully wired to the project register at CMS integration. A curated list of representative engagements is shown below.

All engagements

Additional representative mandates.

Water, digital infrastructure, urban regeneration, energy, industrial and transport mandates.

2024 · Water & environment

Municipal wastewater programme

Technical preparation and independent engineer for a municipal wastewater collection and treatment investment programme — EU Water Framework Directive aligned.

Independent engineer Technical DD ESG
2024 · Digital infrastructure

Tier-III data centre technical advisory

Site selection, feasibility and MEP technical advisory for a Tier-III colocation data centre — EN 50600 aligned, with ESG and energy efficiency integration.

Feasibility MEP EN 50600
2024 · Capital projects

Urban regeneration programme PMO

PMO set-up and programme management for a municipal urban-regeneration programme spanning multiple precincts — with integrated controls and risk.

PMO Programme mgmt Urban
2024 · Energy & utilities

Solar PV portfolio technical due diligence

Lender's technical adviser on a utility-scale solar PV portfolio — yield assessment, EPC review, grid connection and ESG compliance.

Technical DD Solar PV Lender's adviser
2023 · Mining & industrial

Industrial facility EIA & ESG

Environmental and social impact assessment for a greenfield industrial facility — IFC PS 1–8 application, stakeholder engagement and mitigation planning.

EIA IFC PS ESG
2023 · Real estate & built

Mixed-use development technical adviser

Technical advisory from masterplan through detailed design for a major mixed-use urban development — BIM execution, value engineering, sustainability targets.

BIM Design review VE Sustainability
2023 · Transport & mobility

Urban mobility plan & BRT study

Sustainable urban mobility plan (SUMP) and BRT corridor pre-feasibility — demand modelling, alignment selection, institutional and financing analysis.

SUMP BRT Feasibility

Full project case studies — with client testimonials where consent is granted — publish as part of Phase 2 of the content rollout.

Client types

Who we work with.

The Institute's mandates span four institutional client categories — each with distinct engagement, governance and delivery expectations.

01

Governments & municipalities

Ministries, agencies, regulators, municipalities — policy support, feasibility, programme preparation, technical assistance.

02

IFIs & donors

EIB, EBRD, World Bank, KfW, IFC, WBIF — technical preparation, lender's engineer, appraisal support, supervision.

03

Investors & lenders

Commercial banks, private equity, infrastructure funds — technical due diligence, ESG diligence, monitoring and portfolio support.

04

Developers & asset owners

Private developers, utilities, industrial operators, concessionaires — owner's engineer, design, supervision, operational support.

Work with KST Institute

Engage the Institute on your next infrastructure mandate.